Where the machine is built, and who checks it

Four stages, one site: fabrication, assembly, commissioning and final inspection. Every machine leaves with its own inspection record, and the same records can be shared with your engineer before shipment.

HAOXIN factory building and entrance
The plant

One site, four stages

Frames and loader arms are fabricated and welded on site, then assembled with axles, transmission and hydraulics, commissioned and tested. Because the stages sit next to each other, a problem found at inspection can be corrected before the machine is packed — not after it reaches the port.

  • Fabrication and welding of frames, arms and buckets
  • Assembly of driveline, hydraulics, cab and electrical system
  • Commissioning with bucket and attachment fitted
  • Final function, safety and appearance inspection
Process

From steel to container

01 · Fabrication

Structure first

Cutting, forming and welding of the frame, arms and bucket. Weld quality is checked before the structure moves to paint.

02 · Assembly

Driveline and hydraulics

Axles, transmission, engine, hydraulic lines and cab are fitted to the agreed configuration, with component numbers recorded.

03 · Commissioning

Run it before shipping

Each machine is started, run and operated with its bucket or attachment: lifting, steering, braking and hydraulic functions under load.

04 · Inspection

Record and release

Final checks on torque, leaks, electrical functions and paint. The inspection sheet is signed and travels with the machine.

Quality control

What is actually checked

The list below is the working checklist, not marketing copy. If you need a specific test or third-party inspection before shipment, tell us at order stage.

Incoming

  • · Steel plate and section certificates
  • · Engine, axle and transmission identity
  • · Hydraulic components and seals
  • · Tire and rim inspection

In process

  • · Weld appearance and dimension
  • · Torque of critical fasteners
  • · Hydraulic pressure and leak test
  • · Electrical function check

Before shipment

  • · Operation under load with attachment
  • · Brake and steering performance
  • · Paint, decals and documentation
  • · Packing and container loading check
Documents: business licence, component certificates and inspection records can be provided for a specific order. Certificates and test reports are shared only when they apply to the machine being quoted — ask our team for the current list.